On this page
Key facts
- Network size
- 6 MRT lines (over 140 stations, about 200km) and 2 LRT systems (over 40 stations, about 28km)Source: LTA
- Operating hours
- About 5.30am to around midnight daily, often longer on festive occasionsSource: LTA
- Peak frequency
- Every 2 to 3 minutes from 7am to 9am; about 5 to 7 minutes off-peakSource: LTA
- Circle Line Stage 6 opened
- 2026-07-12: Keppel, Cantonment, Prince Edward RoadSource: LTA
- Next openings
- 2026-12-26: Bedok South, Sungei Bedok, Xilin (TEL5 and DTL3e)Source: LTA
- Jurong Region Line Stage 1
- Around mid-2028Source: LTA
- Cross Island Line Phase 1
- Targeted 2030Source: LTA
- Official map
- Free PDF in English, Chinese, Malay and Tamil on LTA's Rail Network pageSource: LTA
The network at a glance
Singapore's trains run on six MRT lines and two LRT systems. LTA says the MRT has more than 140 stations over about 200km, and the LRT has more than 40 stations over about 28km. Two operators run the trains. SMRT runs the North-South, East-West, Circle and Thomson-East Coast lines and the Bukit Panjang LRT. SBS Transit runs the North East and Downtown lines and the Sengkang-Punggol LRT.
Every station has a code made of the line's letters and a number, for example NS1 or EW24. Interchange stations show one code for each line that stops there. Signs and maps also use each line's colour, so learning the colours makes it much easier to find your way.
The lines and their colours
These colours are taken from LTA's official system map (version SM-26-01-EN).
| Line | Code | Colour on the map | Runs between | Operator |
|---|---|---|---|---|
| North-South Line | NS | Red | Jurong East and Marina South Pier | SMRT |
| East-West Line | EW, CG | Green | Tuas Link and Pasir Ris, with a branch from Tanah Merah to Changi Airport | SMRT |
| North East Line | NE | Purple | HarbourFront and Punggol Coast | SBS Transit |
| Circle Line | CC | Orange | A full loop through Marina Bay, HarbourFront, Buona Vista, Bishan and Paya Lebar | SMRT |
| Downtown Line | DT | Blue | Bukit Panjang and Expo | SBS Transit |
| Thomson-East Coast Line | TE | Brown | Woodlands North and Bayshore | SMRT |
| Bukit Panjang LRT | BP | Grey | Loop from Choa Chu Kang and Bukit Panjang | SMRT |
| Sengkang LRT | SE (STC on the map) | Grey | Two loops from Sengkang | SBS Transit |
| Punggol LRT | PE, PW (PTC on the map) | Grey | Two loops from Punggol | SBS Transit |
What each line is for
North-South Line (red). Singapore's first MRT line. It opened in 1987 with five stations between Yio Chu Kang and Toa Payoh. LTA lists 27 stations over 45km today. The line runs north from Jurong East through Woodlands, then south through Ang Mo Kio, Orchard and the city to Marina South Pier, which serves the Marina Bay Cruise Centre. Canberra station opened between Yishun and Sembawang in 2019.
East-West Line (green). At about 57km, this is the longest line in operation. LTA lists 35 stations. It crosses the island from Tuas Link in the far west to Pasir Ris in the east. From Tanah Merah a branch runs to Expo and Changi Airport (station codes CG1 and CG2), so check which way a train is heading before you board east of the city. The four Tuas stations opened in June 2017.
North East Line (purple). LTA describes it as the world's first fully automated, driverless underground heavy rail line. It has 17 stations over 22km, from HarbourFront through Chinatown, Little India, Serangoon and Sengkang to Punggol Coast.
Circle Line (orange). A medium-capacity, driverless line with 33 stations, 12 of them interchanges, over 39km. It became a full loop in 2026 when three stations opened between HarbourFront and Marina Bay. It lets you travel between the north, east and west without passing through City Hall or Raffles Place. Because it is now a loop, trains run clockwise and anticlockwise, and LTA has changed signs and announcements to match. Read the direction on the platform sign carefully.
Downtown Line (blue). A driverless line, fully underground, that runs from Bukit Panjang through Bukit Timah and the city to MacPherson, Bedok, Tampines and Expo. LTA's line page lists 35 stations over 42km. Hume station opened on 2025-02-28. Bencoolen, at 43m below ground, is the deepest station in Singapore according to LTA.
Thomson-East Coast Line (brown). The newest MRT line. It uses four-car driverless trains. It runs from Woodlands North through Thomson, Orchard, Outram Park and Marina Bay, then east along the coast through Katong and Marine Parade to Bayshore. LTA lists 27 stations in service. Mount Pleasant and Marina South stations will open when developments around them are finished. Founders' Memorial station will open with the Founders' Memorial.
The LRT lines (grey). These are small driverless feeder systems that connect housing estates to the MRT. The Bukit Panjang LRT (8km) opened in 1999 and links to Choa Chu Kang (North-South Line) and Bukit Panjang (Downtown Line). The Sengkang LRT (2003) and Punggol LRT (2005) each run on two loops and connect to the North East Line at Sengkang and Punggol. Teck Lee station on the Punggol LRT opened on 2024-08-15.
Key interchanges
These are the busiest or most useful places to change lines, as shown on LTA's system map.
- Dhoby Ghaut (NS24, NE6, CC1): North-South, North East and Circle lines. It was Singapore's first three-line interchange.
- Marina Bay (NS27, TE20, CC33): North-South, Thomson-East Coast and Circle lines.
- Outram Park (EW16, NE3, TE17): East-West, North East and Thomson-East Coast lines.
- Jurong East (NS1, EW24): North-South and East-West lines.
- City Hall (NS25, EW13) and Raffles Place (NS26, EW14): North-South and East-West lines.
- Orchard (NS22, TE14), Woodlands (NS9, TE2) and Bishan (NS17, CC15).
- HarbourFront (NE1, CC29): North East and Circle lines, beside the Sentosa link.
- Buona Vista (EW21, CC22) and Paya Lebar (EW8, CC9): East-West and Circle lines.
- Chinatown (NE4, DT19) and Little India (NE7, DT12): North East and Downtown lines.
- Botanic Gardens (CC19, DT9), Caldecott (CC17, TE9) and Stevens (DT10, TE11).
- Tampines (EW2, DT32) and Expo (CG1, DT35).
The map uses a separate symbol for "tap out to transfer" stations. At these, you leave through the fare gates of one line and enter the other, for example at Newton (NS21, DT11). Check the map legend for this symbol before you plan a transfer.
The newest stations
- Circle Line Stage 6 opened on 2026-07-12. It added Keppel (CC30), Cantonment (CC31) and Prince Edward Road (CC32) between HarbourFront and Marina Bay. Cantonment sits beside the former Tanjong Pagar Railway Station, and LTA has put the old platform canopies back in place.
- Punggol Coast (NE18) opened on 2024-12-10 as the new end of the North East Line. It serves Punggol Digital District and the Singapore Institute of Technology.
- Hume (DT4) on the Downtown Line opened on 2025-02-28.
Opening next
- 2026-12-26: Thomson-East Coast Line Stage 5 and Downtown Line 3 Extension. These add Bedok South (TE30), Sungei Bedok (TE31/DT37) and Xilin (DT36). Sungei Bedok will be an interchange between the Thomson-East Coast and Downtown lines. LTA says the Thomson-East Coast Line will then have 29 stations over 42.8km and the Downtown Line 37 stations over 44.6km. Downtown Line trains will continue past Expo to Xilin and Sungei Bedok.
- End of 2026 (target): Johor Bahru-Singapore RTS Link. A separate cross-border light rail line that runs about 4km from Woodlands North to Bukit Chagar in Johor Bahru. LTA says the trip will take about five minutes. You clear Singapore and Malaysian checks at departure, and the Woodlands North RTS station will connect to the Thomson-East Coast Line station there.
- Around mid-2028: Jurong Region Line Stage 1. This was delayed from end-2027 and will link Choa Chu Kang, Boon Lay and the Tawas area. The JRL is Singapore's seventh MRT line. It will be fully elevated, with 25 stations and interchanges at Choa Chu Kang, Boon Lay and Jurong East. LTA will give updated dates for Stages 2 and 3 later. A further station, JS2A in Tengah, is planned for the mid-2030s.
- 2030: Cross Island Line Phase 1. Twelve stations from Aviation Park (CR2) to Bright Hill (CR13), serving Loyang, Pasir Ris, Tampines, Hougang, Serangoon North and Ang Mo Kio. Phase 2 (towards Jurong Lake District) and the Punggol Extension are due in 2032. Phase 3 to Gul Circle is targeted for the late 2030s.
- 2035: Downtown Line 2 Extension. Three stations that will link Bukit Panjang to a new North-South Line station between Yew Tee and Kranji.
LTA is also starting studies for a Seletar Line, a Tengah Line and a West Coast extension of the Jurong Region Line. No opening dates have been given.
First and last trains
LTA says trains run from about 5.30am to around midnight every day, and hours are often extended on festive occasions. In peak hours (7am to 9am) trains come every 2 to 3 minutes. At other times the wait is about 5 to 7 minutes.
Times differ by station, direction and day. Some examples from LTA's station pages, checked on 2026-11-24:
- Pasir Ris towards Tuas Link: first train 05:28 Monday to Saturday, 05:54 Sundays and public holidays. Last train 23:23.
- Tuas Link towards Pasir Ris: first train 05:19 Monday to Saturday, 05:49 Sundays and public holidays. Last train 23:19.
- Marina South Pier towards Jurong East: first train 06:10 Monday to Saturday, 06:38 Sundays and public holidays. Last train 23:48, plus a 00:04 train that runs only as far as Kranji.
- Punggol Coast towards HarbourFront: first train 05:39 Monday to Saturday, 05:59 Sundays and public holidays. Last train 23:25.
- Woodlands North towards Bayshore: first train 05:36 Monday to Saturday, 05:56 Sundays and public holidays. Last train to Bayshore 23:30, with later trains that end short of Bayshore.
Some of LTA's station pages have not yet been updated for the completed Circle Line. Before a late journey, check your own station on LTA's online map or in the MyTransport.SG app. SMRT and SBS Transit also post changes to their hours.
Getting the official map
- PDF downloads: LTA's Rail Network page has the current system map as a PDF in English, Chinese, Malay and Tamil. The English file is about 1.1MB and prints well.
- Interactive map: LTA's online train map lets you tap a station to see its exits, nearby places and first and last train times.
- At stations: Every station has the system map on display.
- App: LTA's MyTransport.SG app (iOS and Android) covers trains and other public transport.
LTA will update the map when the 2026-12-26 stations open. If you print a copy, check after that date that you have the newer version.
Paying for your ride
Tap in and tap out with a contactless Visa, Mastercard or American Express card, a mobile wallet, a NETS Tap card, or a stored-value card such as EZ-Link. Fares depend on how far you travel. Single-trip tickets were withdrawn in March 2022.